ANALISIS OVERALL EQUIPMENT DAN SIX BIG LOSSES PADA MESIN RUI PACKING DI PT NU
DOI:
https://doi.org/10.69714/a3zyve07Keywords:
downtime, Overall Equipment Effectiveness(OEE), Six Big LossesAbstract
The background of this research is the problem that occurs, namely the large number of downtime on the rui machine at PT. NU. The company has a standard tolerance on downtime which is around 2.5%, while the amount of downtime that occurs in the production process exceeds the specified tolerance limit. Therefore, it is necessary to conduct research that aims to determine the dominant problem causing downtime that occurs on the machine and determine the proposed improvements to reduce the number of downtime by using the Overall Equipment Effectiveness and Six Big Losses method. The results of the study indicate that the OEE value on the rui machine for one year is 69%, this value is still below the world standard. The dominant causes of downtime on the machine are Equipment Failure Losses of 42% and Defect Losses of 30.6% of all time losses. Furthermore, the proposed improvements are to repair spare parts on time, provide spare part stock for quick repair, and provide training to employees about the importance of care and maintenance on the machine.
References
W.K. Chen. Linear Networks and Systems. Belmont, CA: Wadsworth, 1993, pp. 123-35.
Andiyanto, S., Sutrisno, A., Punuhsingon, C.,(2018) Penerapan metode FMEA(Failure Mode And Effect Analysis)Untuk Kuantifikasi dan Pencegahan resiko akibat terjadinya Lean Waste, Universitas Sam Ratulangi, Manado
Ansori, N., & Mustajib, M. I. (2013). Sistem Perawatan Terpadu (Integreted. Maintenance System). Yogyakarta: Graha Ilmu.
Febianti, E., Noviarni,S., Ferdinant,P.F.,(2017) Analisis Efektifitas Mesin Bagging dengan Penerapan Total Productive Maintanance (TPM) pada PT. Lotte Chemical Titan Nusantara, Universitas Sultan Ageng Tirtayasa.
Margono. (2006) Managemen Pemeliharaan dan Perawatan Mesin,Universitas Muhammadiyah Semarang, Semarang
Nakajima, S.(1988). Introduction to Total Productive Maintenance (TPM). Cambridge: Produktivity Press.
Nasution,M., Bakhori,A., Novarika W,(2021) MANFAAT PERLUNYA MANAJEMEN PERAWATAN UNTUK BENGKEL MAUPUN INDUSTRI. Fakultas Teknik Universitas Islam Sumatera Utara.
Prabowo, A.H., & Agustiani, M.(2017). Evaluasi Penerapan Total Productive Maintenance (Tpm) Melalui Pendekatan Overall Equipment Effectiveness (OEE) Untuk Meningkatkan Kinerja Mesin High Speed Wrapping Di Pt. Tes. Jurnal PASTI. Vol XII No. 1(1): 50 – 62.
Prasmoro, A.V., & Fauzi, Ahmad. Optimalisasi Kinerja Mesin 2 SINI JBZ 30 Pembuatan Papercup dengan Metode Overall Equipment Effectiveness (OEE). Journal of Industrialand Engineering System (JIES). Vol. 3 No. 1, Juni 2022, Hal 75 – 87.
Rachmawati, S., & Rinawati, S. (2018). Penerapan Budaya 5R (Ringkas, Rapi, Resik, Rajin Dan Rawat) Dengan Pendekatan Sni Iso 22000 : 2009 Dan Penilaiannya Di PT.Y Surakarta, Journal of Industrial Hygiene and Occupational Health. Vol. 2(2).
Rimawan,E. Raif, A.(2016) Analisis Pengukuran Nilai Overall Equipment Effectiveness (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK). Universitas Mercu Buana, Jakarta.
Rinawati, D.I., & Dewi, N.C. (2014), Analisis Penerapan Total Productive Maintenance (Tpm) Menggunakan Overall Equipment Efectiveness (Oee) Dan Six Big Losses Pada Mesin Cavitec Di Pt. Essentra Surabaya. Jurnal Prosiding Snatif, Vol. 2.
Suliantoro, H. Susanto N, Prastawa H. (2017) PENERAPAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FAULT TREE ANALYSIS (FTA) UNTUK MENGUKUR EFEKTIFITAS MESIN RENG, Universitas Diponegoro, Semarang.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Jurnal Riset Teknik Komputer

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.








