RENCANA ANGGARAN BIAYA DAN EVALUASI E-PROCUREMENT PADA PEMBANGUNAN GEDUNG ASRAMA DI TANGERANG SELATAN
DOI:
https://doi.org/10.69714/t82pyp13Keywords:
E-Procurement, Budget Plan, LPSE, RABAbstract
The Cost Budget Plan (RAB) is one of the main processes in a project because it is the basis for making a financing system offer and the budget framework that will be issued. The Cost Budget Plan (RAB) is needed to calculate a building or project with the amount of costs required for materials, wages and other costs related to building implementation. The Student Dormitory Building Construction Work Package in Bintaro was announced on the LPSE website of the Ministry of Finance. The Dormitory Building stands on a total land area of ±212,222m². Meanwhile, what will be built as a Student Dormitory building with a design area of ±3,647m² with a total of 8 Dormitory floors. From the calculation results, it is known that the recapitulation of the Cost Budget Plan (RAB) is Rp. 67,619,783,891 including 12% VAT with the largest work value being on the 2nd floor structure work with a value of Rp. 7,309,075,651. The advantage of e-Procurement is that it is very helpful for construction service providers to participate in each selection stage because it is not limited by distance and all processes are carried out online. However, in practice, this e-procurement system still relies on offline face-to-face meetings, such as the Aanwijzing stage, and is often found in the final negotiation stage. This can raise suspicion among every tender participant
References
Asroni, Ali. (2010). Kolom Fondasi dan Balok T Beton Bertulang. Yogyakarta: Graha Ilmu.
Ervianto, W.I. (2007). Manajemen Proyek Konstruksi. Yogyakarta: CV Andi Offset.
Jawat, I.W. (2017). Metode Pelaksanaan Konstruksi Revetment. PADURAKSA, Volume 6(2), Desember 2017.
Hamdan Dimyati, H.A. & Nurjaman, K. (2014). Manajemen Proyek. Bandung: Pustaka Setia.
Herjanto, Eddy. (2007). Manajemen Operasi (Edisi Ketiga). Jakarta: Grasindo.
Heryanto, Imam & Triwibowo, Totok. (2013). Manajemen Proyek Berbasis Teknologi Informasi. Bandung: Informatika.
Husein, A. (2011). Manajemen Proyek: Perencanaan, Penjadwalan, dan Pengendalian Proyek. Yogyakarta: Andi.
McShane, S. L., & Von Glinow, M. A. (2015). Organizational Behavior: Emerging Knowledge and Practice for The Real World (5th ed.). New York: McGraw-Hill/Irwin.
Nugraha, et al. (1985). Manajemen Proyek Konstruksi 1. Jakarta: Kartika Yudha.
Reksohadiprodjo, S., & Handoko, T.H. (1992). Organisasi Perusahaan. Yogyakarta: BPFE.
Russell, R.S. & Taylor, B.W. (2011). Operations Management: Creating Value Along The Supply Chain (7th ed.). New York: John Wiley & Sons.
Setiawan, A. (2020). Analisis Penerapan E-Procurement dalam Pengadaan Barang/Jasa Pemerintah. Jurnal Ilmiah MEA (Manajemen, Ekonomi, & Akuntansi), 4(3), 45–56.
Sari, D. N., & Wahyuni, E. (2018). Efektivitas E-Procurement dalam Mewujudkan Transparansi Pengadaan Barang/Jasa Pemerintah. Jurnal Ilmu Administrasi Publik, 6(1), 15–24.
Fitria, A., & Indrajit, R.E. (2019). Evaluasi Sistem Pengadaan Barang dan Jasa Pemerintah Berbasis Elektronik. Jurnal Teknologi dan Manajemen Informasi, 7(2), 120–128.
Fitriani, R. & Priyatno, D. (2017). Perbandingan Efisiensi Pengadaan Konvensional dan E-Procurement di Instansi Pemerintah. Jurnal Akuntansi dan Keuangan Indonesia, 14(1), 33–42.
Prasetyo, A., & Wicaksono, A. (2021). Tantangan dan Solusi Implementasi E-Procurement di Indonesia. Jurnal Administrasi Publik Universitas Brawijaya, 9(2), 112–124.
Yuniarti, M. (2019). Pengaruh E-Procurement terhadap Transparansi dan Akuntabilitas Pengadaan Barang dan Jasa. Jurnal Ilmu Pemerintahan Widya Praja, 45(1), 25–39.
Simangunsong, F. (2018). Sistem Pengadaan Barang/Jasa Pemerintah Berbasis Teknologi Informasi. Jurnal Kebijakan dan Manajemen Publik, 6(2), 100–109.
Handayani, S., & Maulana, I. (2020). Analisis Peran LPSE dalam Mendukung Transparansi Pengadaan Pemerintah. Jurnal Governansi, 6(1), 57–70.
Kurniawan, T. (2022). Evaluasi Implementasi E-Procurement dalam Proyek Konstruksi Pemerintah. Jurnal Teknik Sipil dan Perencanaan, 24(1), 89–98.