PENGUKURAN WAKTU BAKU UNTUK MENENTUKAN PRODUKTIVITAS KARYAWAN DENGAN MENGGUNAKAN METODE JAM HENTI (STUDI KASUS CV. XYZ)

Authors

  • Nanta Sigit Universitas Wisnuwardhana Author
  • Salsabila Faravisa Al’qalbiya Universitas Wisnuwardhana Author
  • Teguhadiyati Pangestyoarini Universitas Wisnuwardhana Author
  • Rusdi Khanafi Universitas Wisnuwardhana Author
  • Moch Januar Ardiansyah Universitas Wisnuwardhana Author

DOI:

https://doi.org/10.69714/fcznav16

Keywords:

Productivity, Standard Time, Downtime Method, Time Study , Normal Time , Allowwance

Abstract

A company definitely wants maximum profit in its business. High productivity is needed from employees who work in order to get maximum profit. But lately CV. XYZ in meeting the needs of its consumers sometimes experiences delays from the predetermined schedule due to the large number of orders received, it is necessary to calculate the standard time with the downtime method for one of the products, namely the CPM knife. The purpose of this research is to identify working hours and effective working hours so that companies can increase their productivity and determine their daily production. The results of the research carried out obtained that the total standard time in making CPM Knives products was 70.86 minutes and employee productivity in making CPM Knives products was that a worker could complete 6.7 units of CPM Knives in 8 hours/day. Based on the calculation of the standard time it was decided to be 6 units/day so that there was a reduction in working hours for 49.79 minutes from 8 hours/day to 7 hours 10.21 minutes/day.

References

Al Faritsy, A. Z., & Suseno, S. PENINGKATAN PRODUKTIVITAS PERUSAHAAN DENGAN MENGGUNAKAN METODE SIX SIGMA, LEAN DAN KAIZEN. J@TI UNDIP : JURNAL TEKNIK INDUSTRI, 10(2)., 103–116, 2015, https://doi.org/10.12777/jati.10.2.103-116

Ayuningtyas, R., Setyanto, N. W., & Efranto, R. Y. (n.d.). ANALISIS PENINGKATAN PRODUKTIVITAS DAN EFISIENSI KERJA DENGAN PENERAPAN KAIZEN (Studi Kasus pada PT Beiersdorf Indonesia PC Malang).

Bora, M. A., Larisang, & Kamariah, T. PENENTUAN PENGUKURAN WAKTU BAKU PEMERIKSAAN WIRE CONNECTOR PADA OUT GOING CHECK MENGGUNAKAN METODE JAM HENTI. Jurnal Industri Kreatif (JIK), 4(01), 57–62, 2020, https://doi.org/10.36352/jik.v4i01.50.

Daryanto. Manajemen Produksi. Satu Nusa.

Febriana, N. V., Lestari, E. R., & Anggarini, S. (n.d.). ANALISIS PENGUKURAN WAKTU KERJA DENGAN METODE PENGUKURAN KERJA SECARA TIDAK LANGSUNG PADA BAGIAN PENGEMASAN DI PT JAPFA COMFEED INDONESIA TBK. 1.

Gozali, L., . A., & . F. PENENTUAN JUMLAH TENAGA KERJA DENGAN METODE KESEIMBANGAN LINI PADA DIVISI PLASTIC PAINTING PT. XYZ. Jurnal Ilmiah Teknik Industri, 3(1), https://doi.org/10.24912/jitiuntar.v3i1.505.

Gunawan, A., Kusnadi, K., & Hamdani, H. Analisis Produktivitas Tenaga Kerja dengan Metode Marvin E. Mundel pada CV. Mulia Tata Sejahtera. Jurnal Serambi Engineering, 6(3), (2021), https://doi.org/10.32672/jse.v6i3.3247.

Kaban, S. I., Dwi Astuti, R., & Pujiyanto, E. Perancangan Alat Pemotong Label untuk Meminimasi Gerakan Repetitive Pekerja di Industri Jago Jaya Shuttlecock Surakarta. MATRIK, 22(1), 65, (2021), https://doi.org/10.30587/matrik.v22i1.1527.

Lukodono, R. P., & Ulfa, S. K. DETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD. Journal of Engineering And Management In Industrial System, 5(2), 87–94, (2018), https://doi.org/10.21776/ub.jemis.2017.005.02.5.

M. I. Tarigan. Pengukuran standar waktu kerja untuk menentukan jumlah tenaga kerja optimal. Jurna Manaj. Inform., 4, 27–35, (2015).

R. D. ; I. I. Astuti. Analisis dan Perancangan Sistem Kerja, (1st ed). Deepublish.

Rahayu, M., & Juhara, S. Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. UNISTEK, 7(2), 93–97, (2020), https://doi.org/10.33592/unistek.v7i2.650.

Regent M, Y. D. USULAN PENENTUAN WAKTU BAKU PROSES RACKING PRODUK AMPLIMESH DENGAN METODE JAM HENTI PADA DEPARTEMEN POWDER COATING. Jurnal Teknik, 7(2), 93–97, (2019), https://doi.org/10.31000/jt.v7i2.1357.

Sukania, I. W., & Gunawan, T. (n.d.). Analisa Waktu Baku Elemen Kerja pada Pekerjaan Penempelan Cutting Stiker di CV Cahaya Thesani.

Sutalaksana. Teknik Perancangan Sistem Kerja. ITB.

Veza, O. ANALISIS WAKTU STANDAR PELAYANAN DAN PRODUKTIVITAS PEGAWAI MENGGUNAKAN METODE WORK SAMPLING. JURNAL INDUSTRI KREATIF (JIK), 1(01), 9., (2017), https://doi.org/10.36352/jik.v1i01.45.

Waluyo. Produktivitas Untuk Teknik Industri. Dian Samudra.

Wignojosoebroto, S. “Pendahuluan” dalam Ergonomi, Studi Gerak dan Waktu: Teknik Analisis untuk Peningkatan Produktivitas Kerja (Cetakan Kempat). Guna Widya.

Downloads

Published

2025-12-18

How to Cite

PENGUKURAN WAKTU BAKU UNTUK MENENTUKAN PRODUKTIVITAS KARYAWAN DENGAN MENGGUNAKAN METODE JAM HENTI (STUDI KASUS CV. XYZ) (Nanta Sigit, Salsabila Faravisa Al’qalbiya, Teguhadiyati Pangestyoarini, Rusdi Khanafi, & Moch Januar Ardiansyah , Trans.). (2025). Jurnal Ekonomi Bisnis Dan Kewirausahaan, 3(1), 17-25. https://doi.org/10.69714/fcznav16